Sale, offer NK-723

Manufacturing and Warehouse Facility in Zielona Góra

Nowy Kisielin, ul. Innowacyjna 9, 66-002 Zielona Góra

Usable area
11,289.75 m²
Plot
4.57 ha
Grid connection capacity
5 MW
Net price
PLN 47,500,000
  • Clear height 7 m, 3 docks
  • Connected: power, gas, water and sewerage
  • S3 expressway (junction): 5 km
Property details

At a glance

Modern manufacturing and warehouse facility built in 2018 and located near the S3 expressway.

11,289.75 m², 4.57 ha plot, 5 MW power, overhead cranes, 3 loading docks.

Manufacturing and Warehouse Facility in Zielona GóraView gallery (43)

Property

A modern complex built in 2018, designed for precision production of components for turbochargers, compressors, braking systems and other engine parts. Full technical infrastructure, process adaptations and an excellent location by the S3 expressway.

Total usable area is 11,289.75 m², divided into a two-storey office and staff facilities building (1,514.16 m²) and a manufacturing and warehouse building (9,726.64 m²) with three functional zones: a tooling and storage hall, a foundry and a CNC hall.

The building is also suitable for other manufacturing sectors that require high electrical capacity, high floor load capacity and overhead crane infrastructure.

Precast reinforced concrete structure with prestressed roof girders, sandwich panel walls and an industrial floor. No basement: the production and warehouse part is single-storey, the office and staff part two-storey. Building height 13 m, clear height under the girders 7.00 m, 10.95 m in the foundry.

Plot 722 (0.5320 ha) is a car park with 115 spaces. The site is fenced and lit, with a 40 m² gatehouse at the entrance gate, a retention tank and storage shelters.

  • Plots no. 723 (4.0397 ha) and 722 (0.5320 ha)
  • Usable floor area: 11,289.75 m²
  • Gross building volume: 103,232 m³
  • Building height 13 m, clear height under girders 7.00 m (foundry 10.95 m)
  • Floor load capacity: 100 kN/m²
  • 3 loading docks in the warehouse and 5 ground-level sectional doors
  • Car park with 115 spaces (plot 722), fenced and lit site
  • Zoning plan: area 3P/U, production and service use; archaeological site on part of plot 723
  • Fully serviced: power, gas, water, sewerage

Equipment and logistics

The hall was designed and built for precision production of turbocharger, compressor and braking system components. Machining takes place in enclosed chambers with dust extraction.

Loading docks
3
Ground-level doors
5
Overhead cranes
10 t + 2× 6.3 t
  • 10 t overhead crane + 2× 6.3 t cranes (foundry hall and melting shop)
  • Medium-voltage transformer stations
  • Screw compressors
  • Process water cooling system for the foundry
  • Extraction systems with filters for machines and furnaces
  • CNC hall 3,452 m² (laboratory, X-ray, mezzanine)
  • Compressed air, chilled and process water, process drainage
  • Central heating and hot water, ventilation and air conditioning
  • Passenger lift, lightning protection, telecommunications
  • Warehouse: 3 docks (1 sectional door and 2 hydraulic ramps); rest of the building: 5 ground-level sectional doors
  • Manoeuvring yards, car park with 115 spaces, 40 m² gatehouse at the entrance gate, retention tank, storage shelters

Drone video

Floor areas

11,289.75 m²usable area, 5 parts in 2 zones

Manufacturing and warehouse buildingm²share
Hall A: toolroom, warehouse, shot blasting1,519.5514%
Hall B: foundry2,536.8423%
Hall C: CNC, laboratory, warehouses5,670.2550%
Total9,726.6487%
Office and staff facilities buildingm²share
Ground floorLobby, reception, director's office, open space, conference room, catering, health and safety, HR797.157.1%
First floorSecretariat, CEO's office, conference room, offices, accounting, IT department, server room, changing rooms717.016.4%
Total1,514.1613%

Area breakdown according to the owner's documentation. Total usable floor area: 11,289.75 m².

Manufacturing and warehouse building
Clear height
7.00 m / 10.95 m
Floor load capacity
100 kN/m²
Built-up area
9,504.05 m²
Office and staff facilities building
Built-up area
856.98 m²
Storeys
2

Utilities

UtilityCapacityStatus
ElectricityTarget capacity 5 MW under ENEA's 2017 technical connection conditions. Supply from an ENEA medium-voltage cable connection.5 MWConnected
Natural gasSecond-degree pressure reduction and metering station, max. capacity 800 Nm3/h. Connection capacity 710 m3/h, GZ-41.5 (Lw) gas, pressure after reduction 20 kPa.710 m3/hConnected
WaterTwo-way supply via Ø160 connections from the Ø225 main in the public road. Water meter chamber, DN80 above-ground hydrants.-Connected
SewerageSealed gravity system PVC-U SN8. DN1000 manholes, D400 cast-iron covers.-Connected

Location and zoning

The property is located in the Lubuski Industrial and Technology Park, right next to the Science and Technology Park of the University of Zielona Góra. The area is covered by a local zoning plan for industrial and service use.

Location analysis

Property plots

Checking public registers: plots, zoning plans, land classes, nature protection, flood risk and statistics.

Distances

NK-7231 km Voivodeship road DW 2825 km S3 expressway (junction)10 km Zielona Góra city centre35 km Zielona Góra-Babimost Airport60 km A2 motorway90 km German border130 km Poznań160 km Wrocław160 km Berlin290 km Prague413 km Warsaw
  1. 1 kmVoivodeship road DW 282
  2. 5 kmS3 expressway (junction)
  3. 10 kmZielona Góra city centre
  4. 35 kmZielona Góra-Babimost Airport
  5. 60 kmA2 motorway
  6. 90 kmGerman border
  7. 130 kmPoznań
  8. 160 kmWrocław
  9. 160 kmBerlin
  10. 290 kmPrague
  11. 413 kmWarsaw

PSI support

40-60%aid intensity, depending on company size

An investment at this location may qualify for an income tax exemption under the Polish Investment Zone. We help prepare the application.

Max. exemption period
14 years
Zone
Kostrzyńsko-Słubicka SSE
Relief details and calculator at ulga-psi.pl (Polish)

Gallery

360° tour

Book a site visit

We will show you the property on site and share documents in the Data Room after an NDA is signed.

We'll call you

Leave your number, we'll call back within one business day

Data Room

Property documents for investors

Register extracts, building design, connection conditions, valuation report. Access after signing a non-disclosure agreement (NDA).