Park Nowa Sól I

Investment Area I Details
0 m2
Powierzchnia terenu inwestycyjnego nr II
0 m2
Maximum Building Coverage 80%

Info

The investor proposes modern class A warehouse buildings with a total area of nearly 93,000 m² in Nowa Sól, another attractive location in the Lubusz Voivodeship for both Polish and international investors. The focus is on setting new standards for warehouses in Europe, minimizing the environmental impact, and taking care of employees and local communities.

Park Nowa Sól II consists of two class A warehouse buildings offering flexible modules, ideal for various industries. The Lubusz region is home to industrial centers such as Zielona Góra, Gorzów, and Żary, known for manufacturing furniture, computers, electronic and optical products, paper, and automotive parts. The location along the Polish-German border and close to the S3 expressway and the A2, A4, and A6 motorway system ensures excellent transport connections.

Building Information

Building A: 54,706 m²* (Available soon)
Building B: 38,226 m²* (Available soon)

Location

City / Municipality: Nowa Sól
Address / Street: Dolnośląska / Żabia
County: Nowosolski
Voivodeship: Lubusz
Special Economic Zone: Kostrzyn-Słubice SEZ

Area Details

Total Land Area: 10.68 ha + 10.87 ha
Plot Shape: Other / Regular

Local Spatial Development Plan

Designated Use in MPZP: Production buildings, storage, warehouses

Building Form: As production or service buildings in standalone or compact development.

Maximum Building Intensity Ratio: 4.0

Building Coverage on Plot: Up to 80% of the plot area

Biologically Active Area: At least 5% of the plot area

Building Height: Not to exceed 40m to the ridge or its highest edge

Transport Connections

Motorway / Expressway:
– S3: 4,6 km / 5 min
– A18/A4: 85,7 km / 53 min
– A2: 71,6 km / 44 min

Port: River Port Nowa Sól (Oder): 4.6 km
Railway / Siding: Nowa Sól / 3,5 km
Airports:
– Airport Zielona Góra – Babimost: 56,8 km
– Airport Wrocław: 160 km

Cities:
– Zielona Góra – 22 km / 16 min
– Poznań – 163 km / 1 h 32 min
– Wrocław – 150 km / 1 h 27 min
– Berlin – 222 km / 2 h 19 min

Utilities

Electricity: Technical conditions received:
Hall A: 1,55 MW; 4,9 MW; 10 MW
Hall B: 1,07 MW; 10 MW

✓ Gas: Technical conditions received:
Hall A: 466 m3/h
Hall B: 1000 m3/h

✓ Water: Technical conditions received:

Hall A: 31,65 m3/day
Hall B:  24,4 m3/day

✓ Stormwater Drainage: 
Possibility to discharge stormwater into the Solanka Canal / in progress.

 Sanitary Sewage:
Hall A: 30,10 m3/day
Hall B:  21,3 m3/day

Price

+ 48 22 230 29 36

Transaction

Lease of space / Purchase of land

Panorama 360°

Scroll to Top