Sale, offer 08-762

Production plant of 3,000 m² on a 3.17 ha plot, Gorzów Wielkopolski

Gorzów Wielkopolski

Usable area
2,937 m²
Plot
3.17 ha
Grid connection capacity
1.2 MW
Net price
PLN 13,000,000
  • Connected: power, gas, water, sewerage and fibre
  • Potential PSI relief: 40-60% aid intensity
Property details

At a glance

Ready production plant built in 2006 (approx. 3,000 m²) on a 3.17 ha plot in the Kostrzyn-Słubice SEZ, on national road 22.

1.2 MW of power, ISO 8 cleanroom, possible extension of approx. 15,000 m². Sale of the property or 100% of the company shares.

Zakład produkcyjny 3000 m² na działce 3,17 ha, Gorzów Wielkopolski - zdjęcie 1View gallery (18)

Property

A ready production plant for sale in Gorzów Wielkopolski, within the Kostrzyn-Słubice Special Economic Zone. The transaction may cover the property (a building of approx. 3,000 m² with a 3.17 ha plot) or 100% of the shares in the company that operates it.

The company was established in 2005 within an international technology group based in Germany and until the end of 2025 manufactured printed circuit boards (PCB) here: drilling, milling, screen printing, electrical and visual testing, and CAD/CAM development. By decision of the group, the company is in liquidation; it holds current ISO 9001, ISO 14001 and IATF 16949 certificates. The machinery has been moved to Berlin.

The building from 2006 has a production part of approx. 2,200 m² and a two-storey office and staff part of approx. 500 m², plus a gatehouse and a transformer station. LED lighting was fully replaced in 2024. The office part is furnished and equipped, windows are aluminium. The electrical testing hall has an ESD floor, the plant has an ISO 8 cleanroom, and floor load capacity in the production halls is 20 kN/m². Compressed air and dust extraction installations are included.

The building has up-to-date inspections, is heated and serviced, and according to the owner requires no repairs. The plot has parking for 54 cars and access roads for trucks. The development conditions allow up to 80% of the plot to be built up with buildings up to 15 m high, which gives room for an extension of approx. 15,000 m².

The plant is located on national road 22, near the S3, 57 km from the Kostrzyn nad Odrą border crossing. A bus stop is 300 m from the gate and a tram stop 400 m, with large residential districts a few hundred metres away. Taking over the experienced staff is possible; the management speaks German.

  • Ready plant of approx. 3,000 m² built in 2006, no repairs needed
  • Installed power 1.2 MW, own substation 2 x 630 kVA
  • Possible extension of approx. 15,000 m² (up to 80% coverage, up to 15 m)
  • ISO 8 cleanroom, ESD floor, floor load 20 kN/m²
  • Sale of the property or 100% of the company shares
  • Kostrzyn-Słubice SEZ, on national road 22, near the S3
  • Parking for 54 cars, truck access
  • Public transport 300-400 m away, residential districts nearby

Floor areas

2,937 m²usable area, 2 parts in 2 zones

Production aream²share
Production area2,20081%
Office and staff aream²share
Office and staff area50019%

Area breakdown according to the owner's documentation. Total usable floor area: 2,937 m².

Production area
Office and staff area
Storeys
2

Utilities

UtilityCapacityStatus
ElectricityOwn transformer station S-1889 (2 x 630 kVA) connected to an ENEA station. Installed power 1,200 kW, demand 1,000 kW.1.2 MWConnected
Natural gasPressure reduction station, natural gas group E (GZ-50).65 m3/hConnected
Water4.57 m3/hConnected
Sewerage-Connected
Stormwater drainageOil separator, 10 l/s.-Connected
Fibre opticFibre optic (Netia).-Connected

Location and zoning

On national road 22 in Gorzów Wielkopolski, in the Kostrzyn-Słubice SEZ, with public transport at the gate.

Location analysis

Property plots

Checking public registers: plots, zoning plans, land classes, nature protection, flood risk and statistics.

Distances

08-7620.1 km DK22 national road5 km Gorzów Wielkopolski57 km Kostrzyn nad Odrą border crossing
  1. 0.1 kmDK22 national road
  2. 5 kmGorzów Wielkopolski
  3. 57 kmKostrzyn nad Odrą border crossing

PSI support

40-60%aid intensity, depending on company size

An investment at this location may qualify for an income tax exemption under the Polish Investment Zone. We help prepare the application.

Max. exemption period
14 years
Zone
Kostrzyńsko-Słubicka SSE
Relief details and calculator at ulga-psi.pl (Polish)

Gallery

Book a site visit

We will show you the property on site and share documents in the Data Room after an NDA is signed.

We'll call you

Leave your number, we'll call back within one business day

Data Room

Property documents for investors

Register extracts, building design, connection conditions, valuation report. Access after signing a non-disclosure agreement (NDA).